This new, concrete wall appears to be almost
complete.
Sunday, June 3, 2018
These are wooden construction mats
They are a common sight in construction zones. They keep heavy construction vehicles from
sinking into soft ground, sand, or mud.
Also, they keep pipelines from breaking under the heavy construction vehicles.
These mats appear to have had much use for years.
I’m sure that construction vehicles move these around
the Superior Street construction site as needed.
These items were dug up from under the asphalt pavement
I’m not sure what these wooden posts were used for
under the street. However, they appear
to have been in the ground for a long time.
The abandoned trolley tracks are being dug up. However, I wish that someday in this century new
trolley tracks will be put down for a new generation of trolley customers.
Another shot of the abandoned trolley tracks that will
soon be recycled into new, useful things.
The street reconstruction south of the Lenox Place Apartments
Somewhere on this street is the eastern edge of the
MnDOT reconstruction site and the western edge of the Superior Street
reconstruction. I hope that the
construction crews know where the edges of their reconstruction
responsibilities are. I don’t want to
see two or three feet of Superior Street remain a gravel road because the construction
crews could not agree on who was responsible for rebuilding what sections of
this street.
What I found at Lenox Place Apartments
Please notice that rebar below the Lenox Place Apartment
sign. What I find interesting is that those
construction workers would leave expensive rebar unattended during a
weekend. With scrap metal thieves in
Duluth, Minnesota I would think that the construction contractors would keep
all that metal locked away during the weekend.
And, if you see thieves stealing metal or anything else from a public construction
site, please report those thieves to the police.
The Mesaba Avenue overpass above West Superior Street
While the Superior Street reconstruction ends west of
the Gateway Tower, according to a MnDOT site, this reconstruction depicted in this
photograph is part of the MnDOT Highway 194 / Mesaba Avenue / Highway 2
reconstruction project. Yes, it is true
that Minnesota has just two seasons winter and highway construction.
http://www.dot.state.mn.us/d1/projects/hwy194-mesaba-duluth/index.html
Reflection on the SS William A. Irvin
After a rainstorm, go out for a walk to find nice
reflections on ground pools of rain water.
I found this one by chance, providing me with a photogenic image for my
blog.
Subscribe to:
Posts (Atom)